<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto"><div dir="ltr"></div><div dir="ltr">Hi Henry,</div><div dir="ltr"><br></div><div dir="ltr">Which part of logistics you are addressing this to? </div><div dir="ltr">With regard to On-site, they always had one gator (and a trailer). Their primary purpose is to move stuff, so yeah, they need it… We don’t need to (or can) move everything by forklift. It was used intensively last time, also to support meubelhaus.</div><div dir="ltr"><br></div><div dir="ltr">Regards,</div><div dir="ltr">Manduca</div><div dir="ltr"><br><blockquote type="cite">On 15 Apr 2025, at 11:49, Henry Schokkenbroek via Logistics <logistics@lists.why2025.org> wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr">
<meta http-equiv="content-type" content="text/html; charset=UTF-8">
<p>Hi Team:Logistics,</p>
<p>We went through the Gator/Site-Carrier list this weekend and saw
that your team requested a gator.<br>
We wonder why there is a need for a gator in your team, as you
normally don't have one and have enough of other equipment on
wheels.</p>
<p>with Regards,<br>
- Henry</p>
<pre class="moz-signature" cols="72">--
Henry Schokkenbroek (Paulissen)
T: +31611530564</pre>
<lt-container></lt-container>
</div></blockquote></body></html>