[Nuts] [Logistics-leads] Team:Nuts - Request: Moving Nuts HQ to LSD
Manduca
manduca at why2025.org
Sun Jul 6 11:00:57 CEST 2025
Hi Sjors,
Thanks for your detailing. Had a good discussion on in the team, and are
looking for ways to make it fit.
Got access to the mapping system yesterday. Trying to figure it out
today. Then I can see if I can make it fit.
The weekend has been more busy then expected so it is taking a bit
longer. But I'm on it :).
And yes, let's keep in close contact.
Regards,
Manduca
On 05/07/2025 20:38, Sjors Baeten wrote:
> Hi Manduca,
>
> In the attachment I've made some markups on the print screen to
> elaborate the sketch drawing.
>
> The basics of the layout is as follows;
>
> * 20ft storage containers on the left and right side
> * Office 6x6m in the lower right corner
> * Crew laydown area / units (9x2,5m) in the back
> * Storage space for cable crates and stuff that won’t be delivered or
> transported in containers.
> o This area is surrounded and split by a driving lane.
>
> Logistic wise, we would suggest to load- and unloading trailers on the
> gravel road (in the parking section next to the road). I believe that
> was the planning from the start, or at least from our point of view.
>
> Traffic on the LSD itself other than delivery of the 20ft containers, I
> expect this will be limited to forklifts and small transport vehicle
> (gator) or such.
>
> In terms of space I think it’s close to what we actual need. We’ve got
> quite a lot containers and stuff that we transport or is delivered in
> normal transport trailers.
>
> The actual count of needed containers will be known in the last week
> before the event and the storage space for crates at the event itself. I
> haven’t see your drawing yet, but I can’t imagine that there’s not
> enough space for the both of us, it’s about 200x90m! I think the best we
> can do is keep in touch with each other during the buildup and delivery
> of stuff. In my opinion we’ll know soon enough during the first buildup
> days If we need less space and can rearrange pieces.
>
> Today I’ve had time to convert the quick sketch into a drawing with
> actual sizes of the objects (see second attachment).
>
> It turns out that the sketch was well estimated because the drawing
> doesn’t needs more space than the sketch or the reservation we’ve made
> on the map in the yellow area last February.
>
> Met vriendelijke groet, Kind regards,
>
>
> *Sjors Baeten*
>
> WHY2025 Team: Nuts (DaMystoryMan)
>
> E-mail: sjors at captainpower.nl <mailto:sjors at captainpower.nl>
>
> *Captain Power*
>
> Kuikseindseweg 24, 5091 TD Middelbeers
>
> Internet: www.captainpower.nl <http://www.captainpower.nl/>
>
> -----Oorspronkelijk bericht-----
> Van: Manduca <manduca at why2025.org>
> Verzonden: woensdag 2 juli 2025 22:19
> Aan: Sjors Baeten <sjors at captainpower.nl>; logistics-leads at lists.why2025.org
> CC: nuts at lists.why2025.org
> Onderwerp: Re: [Logistics-leads] Team:Nuts - Request: Moving Nuts HQ to LSD
>
> Hi,
>
> Thanks for your mail. I'll send a complete response later. Bit burned
> down by meetings and long working days now.
>
> I did send drawings to Terrain, but they never got incorporated in de
> map. And because normally nobody cares what LSD looks like except for
> ourselves I never bothered about it. I'll make an updated better one.
>
> Will probably be this weekend.
>
> I do have a first request to better explain your picture, and include
> the whole LSD so I have a size reference. For what it looks like now,
> it's is more then a quarter of LSD. Why this amount of space is needed,
> and is it essential or nice to have?
>
> I also would like to know what kind of traffic you are expecting. So I
> can think of efficient routing so that we do not block each other. We
> were planning on unloading trucks on this terrain and we need
> maneuvering space for the forklifts.
>
> This would help me to think of ways we could integrate this on the field
> so I can do some suggestions.
>
> Regards,
>
> Manduca
>
> On 02/07/2025 21:11, Sjors Baeten wrote:
>
> > Dear team On-site Logistics,
>
> >
>
> > In the past few months we’ve got requests from Team:Terrain and
>
> > Team:Projectleiding if it’s possible to move our storage units (and
>
> > thus our HQ) to the LSD area.
>
> >
>
> > From my understanding this discussion was already taken place since
>
> > the early start of the terrain planning, and at that time this was
> not possible.
>
> >
>
> > In our last meeting with Team:Terrain a few weeks ago we’ve got the
>
> > request again from Team:Projectleiding so here we are again 😉
>
> >
>
> > Since there’s no information of the LSD layout in the QGIS map I could
>
> > not take your layout into account, so I’ve drawn a concept on a white
>
> > piece of paper of what space we need.
>
> >
>
> > It’s roughly 55x30m see screenshot below
>
> >
>
> > From our end it’s fine where our HQ is positioned right now (in the
>
> > yellow area), but it seems that other parties really want us to move
>
> > to LSD to clear space for visitors.
>
> >
>
> > Can you check if this works for you, or can you workaround this
> positioning?
>
> >
>
> > Met vriendelijke groet, Kind regards,
>
> >
>
> >
>
> > *Sjors Baeten*
>
> >
>
> > WHY2025 Team: Nuts (DaMystoryMan)
>
> >
>
>> E-mail: sjors at captainpower.nl
> <mailto:sjors at captainpower.nl><mailto:sjors at captainpower.nl
> <mailto:sjors at captainpower.nl>>
>
> >
>
> > *Captain Power*
>
> >
>
> > Kuikseindseweg 24, 5091 TD Middelbeers
>
> >
>
>> Internet: www.captainpower.nl <http://www.captainpower.nl><http://
> www.captainpower.nl/ <http://www.captainpower.nl/>>
>
> >
>
> >
>
> --
>
> Manduca
>
> Teamlead Logistics WHY2025
>
> Hacking logistics since 1997
>
--
Manduca
Teamlead Logistics WHY2025
Hacking logistics since 1997
More information about the Nuts
mailing list