Dear Jeroen,


I am preparing to respond to Vincent tonight and I saw that you 
initially asked for the Klic melding, and I just look through it and I 
don't see that it has the information about the lines that run on the 
actual terrain (There is one fiber on the wagenweg, but not even to the 
heuvel where I would expect it).
As far as I can see we know everything in the surrounding area, but not 
the stuff that is supposed to be on our field.
Am I just blind or is this in a different document that the terrain 
owners gave you/us ?


Best,
Gina

On 6/16/25 11:10, Vincent Kloesmeijer via Terrain wrote:
> Beste Why25 terrein,
>
> We zijn begonnen met de voorbereiding maar we missen nog een aantal 
> zaken. Kunnen jullie die naar ons verduidelijken svp?
>
> Klic melding
> We kunnen de nutsvoorzieningen op het terrein niet zien. Kunnen jullie 
> ons de combinatie van tenten met de plattegrond van de Klic-melding 
> sturen? Alle aluhallen worden met grondpennen van 1 meter lang 
> verankerd (voor pagode tenten is dit niet nodig). Jullie zijn ervoor 
> verantwoordelijk om aan te geven waar de leidingen lopen. Wij moeten 
> controleren of we de tenten met grondpennen kunnen verankeren en niet 
> zijn ingetekend op een locatie waar leidingen lopen.
>
> Doorgangen van tenten
> We kunnen op de tekening niet zien waar de in- en uitgangen van de 
> tenten zijn. Bij alle tenten moeten we de windverbanden en 
> oploopplaten weten. En bij gekoppelde tenten moeten we een regengoot 
> plaatsen i.p.v. een wand. Deze dingen zitten aan de tenten vast en we 
> moeten vooraf een bevestiging aan de tentconstructie maken. Dit kan 
> niet achteraf.  Daarom gaan we de tenten op detail intekenen en moeten 
> we dus exact weten waar de doorgangen zijn.
>
> Pagode tenten
> We missen een flink aantal (voornamelijk pagode) tenten. Op de 
> plattegrond en in de bijgeleverde Excel staan er volgens mij ca. 40 
> stuks maar er zijn 87 pagodetenten besteld (met nog een optie op 8 
> stuks). Wanneer dit klaar is willen we die ook graag ontvangen?
>
> Alvast dank en voor vragen zijn we beschikbaar.
> Met vriendelijke groet/ Kind regards,
>
> Vincent Kloesmeijer
> +31 (0)62 - 061 29 40
> +31 (0)70 - 511 93 95
> vincent at maessen-ts.nl <mailto:vincent at maessen-ts.nl>__
> <https://www.linkedin.com/in/maessen/>
> Op al onze dienstverlening zijn onze *algemene voorwaarden 
> <https://www.maessententen.nl/wp-content/uploads/2021/04/Algemene-Voorwaarden-Maessen-NED-COVID-19-1.pdf>* van 
> toepassing.
> ------------------------------------------------------------------------
> *Van:* jeroen at ifcat.org <jeroen at ifcat.org>
> *Verzonden:* donderdag 12 juni 2025 21:40
> *Aan:* Vincent Kloesmeijer <vincent at maessen-ts.nl>; why2025 at rox.gay 
> <why2025 at rox.gay>; bart at tuduft.nl <bart at tuduft.nl>; Steffen van den 
> Aardweg <steffen at maessen-ts.nl>; Sjoerd Wildering <sjoerd at maessen-ts.nl>
> *CC:* terrain at lists.why2025.org <terrain at lists.why2025.org>; 
> 'Boekenwuurm' <boekenwuurm at ifcat.org>; 'Daan Spoek' <daan at spooker.nl>
> *Onderwerp:* RE: Detail planning tent buildup and teardown WHY2025
>
> Vincent,
>
> We zijn er sort of uit met LQF qua in elkaar schuiven van afbraak en 
> opbouw op 31-7-2025 van LQF en WHY.
> Daan ziet geen problemen maar moet nog even final check bij LQF 
> productie team doen en natuurlijk de tegenvallers & meevallers tijdens 
> de afbraak van LQF.
>
> Attached tekening van de posities van de grote tenten, de pagodes van 
> sponsoren en villages worden later ingetekend..
>
> https://docs.google.com/spreadsheets/d/1R0B0l73yNMc54m91QgpUehwEKdIlbQNfSrg0ICLkaKw/edit?gid=176808624#gid=176808624
>
> Als het goed is kunnen jullie in deze xls kijken en daar staan in 
> bruin een anta data in die we graag wille wijzigen qua op en afbouw.
> Zouden jullie kunnen kijken hoe dat uitpakt voor jullie ?
>
> Bij het afbreken van de Sponsor tenten en village tenten moeten we 
> tijdens het afbreken op 13-8-2025 tussen 07:00 en 13:00 kijken welke 
> leeg zijn en daar beginnen.
> Na 13:00 is het jammer dan moeten ze leef zijn.
>
> Jeroen
>
> *From:*jeroen at ifcat.org <jeroen at ifcat.org>
> *Sent:* donderdag 5 juni 2025 21:55
> *To:* 'Vincent Kloesmeijer' <vincent at maessen-ts.nl>; 'why2025 at rox.gay' 
> <why2025 at rox.gay>; 'bart at tuduft.nl' <bart at tuduft.nl>; 'Steffen van den 
> Aardweg' <steffen at maessen-ts.nl>; 'Sjoerd Wildering' 
> <sjoerd at maessen-ts.nl>
> *Cc:* 'terrain at lists.why2025.org' <terrain at lists.why2025.org>; 
> 'Boekenwuurm' <boekenwuurm at ifcat.org>
> *Subject:* RE: Detail planning tent buildup and teardown WHY2025
>
> Hi,
>
> I just sent a mail to Daan to verify the last dates of tents to be 
> built on the 31^st .
> As soon as I have the answer from LQF I will contact Sjoerd about the 
> fine tuning of the dates.
>
> @Members of team terrain, can you set up contact with Steffen and 
> start discussing how you want tents to be laid out ?
>
> The map with tent names can be found here : 
> https://wiki.why2025.org/images/4/43/MapGeneralView.pdf
>
> Jeroen
>
> *From:*Vincent Kloesmeijer <vincent at maessen-ts.nl>
> *Sent:* woensdag 4 juni 2025 11:40
> *To:* jeroen at ifcat.org; why2025 at rox.gay; bart at tuduft.nl; Steffen van 
> den Aardweg <steffen at maessen-ts.nl>; Sjoerd Wildering 
> <sjoerd at maessen-ts.nl>
> *Cc:* terrain at lists.why2025.org; 'Boekenwuurm' <boekenwuurm at ifcat.org>
> *Subject:* Re: Detail planning tent buildup and teardown WHY2025
>
> Hello All,
>
> Thanks for the introduction. I would like to connect you to Steffen 
> and Sjoerd.
>
> @Steffen van den Aardweg <mailto:steffen at maessen-ts.nl> is our 
> technical designer for this project. He is going to make a layout of 
> all the individual tents. It is important for him to know where all 
> the materials like entrances (ramps) and wind-bracing (steel 
> crossbars) need to be placed.
>
> @Sjoerd Wildering <mailto:sjoerd at maessen-ts.nl>will coordinate the 
> planning regarding the equipment, building up and breaking down of the 
> tents. He likes to know what we can delay and where we can gain time.
>
> Can you please share the map and the planning you have so far. It does 
> not have to be the final version. We just want to start preparing. We 
> will also not have them finished right away. It will take a few weeks. 
> When we are finished, we will send it to you for approval.
>
> Thanks in advance, we look forward to making this a great event.
>
> Met vriendelijke groet/ Kind regards,
>
> Vincent Kloesmeijer
>
> +31 (0)62 - 061 29 40
> +31 (0)70 - 511 93 95
>
> vincent at maessen-ts.nl <mailto:vincent at maessen-ts.nl>__
>
> <https://www.linkedin.com/in/maessen/>
>
> Op al onze dienstverlening zijn onze *algemene voorwaarden 
> <https://www.maessententen.nl/wp-content/uploads/2021/04/Algemene-Voorwaarden-Maessen-NED-COVID-19-1.pdf>* van 
> toepassing.
>
> ------------------------------------------------------------------------
>
> *Van:*jeroen at ifcat.org <jeroen at ifcat.org>
> *Verzonden:* donderdag 22 mei 2025 22:43
> *Aan:* Vincent Kloesmeijer <vincent at maessen-ts.nl>; why2025 at rox.gay 
> <why2025 at rox.gay>; bart at tuduft.nl <bart at tuduft.nl>
> *CC:* terrain at lists.why2025.org <terrain at lists.why2025.org>; 
> 'Boekenwuurm' <boekenwuurm at ifcat.org>
> *Onderwerp:* Detail planning tent buildup and teardown WHY2025
>
> Vincent,
>
> As discussed today over the phone about the extra tents and other 
> materials I would set up contact between you and our team terrain.
> Can you add your work planner/tent layout designer and use a reply all 
> to this email thead so we can all see the communication ?
>
> I just had a long call with out terrain team and we need to discuss 
> the following topics :
>
>  1. Our ticket sales are going well that is one of the reasons we
>     needed the extra tents I requested today.
>     It also means that some visitors are coming 1 day earlier than
>     originally planned and leaving 0,5 days later than we originally
>     planned.
>
>     Our terrain team is looking at the current buildup and teardown
>     dates and making a more detailed buildup and teardown planning.
>     They are looking/requesting some changes in  buildup and
>     teardowndates of tents.
>
>     I have asked them to compile the complete list of their changes I
>     can share that, so we can discuss the possibilities in one go.
>  2. We have planned the Pagode teardown on Wednesday the 13^th of
>     August, due to visitor security they want a ban on forklift
>     traffic until Wednesday the 13^th 13:00.
>     How much manual work can we do on tearing down various tents
>     pagodes/alu halls without manitou driving ?
>     I have asked our terrain team to make a list of tents we can have
>     empty on the morning of the 13^th , for instance at least some of
>     the pagodes and the workshop tents.
>
> Jeroen.
>
>
> _______________________________________________
> Terrain mailing list
> Terrain at lists.why2025.org
> https://lists.why2025.org/mailman/listinfo/terrain
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.why2025.org/pipermail/terrain/attachments/20250616/ad661239/attachment.html>

-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-o1cpcbyf.png
Type: image/png
Size: 10355 bytes
Desc: not available
URL: <http://lists.why2025.org/pipermail/terrain/attachments/20250616/ad661239/attachment.png>

-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-von23ml4.png
Type: image/png
Size: 2137 bytes
Desc: not available
URL: <http://lists.why2025.org/pipermail/terrain/attachments/20250616/ad661239/attachment-0001.png>

-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 10355 bytes
Desc: not available
URL: <http://lists.why2025.org/pipermail/terrain/attachments/20250616/ad661239/attachment-0002.png>

-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 2137 bytes
Desc: not available
URL: <http://lists.why2025.org/pipermail/terrain/attachments/20250616/ad661239/attachment-0003.png>


More information about the Terrain mailing list